• USGBC Increases LEED Energy Performance Requirements

    More points needed to achieve certification under 2009 system.

    May 10, 2016
    2 min read
    1652313158342 B 0616 News Park

    New projects registering for LEED 2009 must now meet a higher threshold for minimum energy performance.

    Projects must now earn at least 4 of a possible 19 points in Energy & Atmosphere Credit 1, Optimize Energy Performance. An energy savings of at least 18% is required for a new building, while 14% is the minimum savings for a major renovation over the baseline rating according to ASHRAE 90.1-2007. The previous requirement was 10% for new buildings or 5% for a major renovation compared to the ASHRAE baseline.

    This requirement applies to seven LEED categories: New Construction, New Construction Retail, Schools, Healthcare, Multifamily Midrise, Commercial Interiors and Commercial Interiors Retail. Additionally, newly registered Core & Shell projects will now have to demonstrate a 14% improvement for new buildings or 10% for major renovations.

    Options 2 and 3, the prescriptive compliance paths previously noted in the LEED criteria that offered alternative paths to energy modeling, cannot yield enough points to meet the four-point mandatory minimum, so they can no longer be used to comply with EA Credit 1.

    This change applies to all LEED 2009 projects registered until Oct. 31, the last day a project can be registered under LEED 2009.

    USGBC also introduced a new pilot credit, Integrative Analysis of Building Materials, which rewards projects for sourcing products from manufacturers that share lifecycle health, safety, and environmental information.

    Voice your opinion!

    To join the conversation, and become an exclusive member of Buildings, create an account today!

    Sponsored Recommendations

    Sign up for our Newsletter
    Get the latest news and updates.

    Latest from Green Certification

    ID 132697018 | Manufacturing © Somnuek Saelim | Dreamstime.com
    dreamstime_xxl_132697018
    It’s possible to reduce the plastic waste coming out of your office building—and it can benefit your organization. Here’s how.
    March 28, 2025
    ID 150611537 © Mrtwister | Dreamstime.com
    dreamstime_xxl_150611537
    Put a plan in place now to meet building performance standards in your area—it not only keeps you compliant, but ensures the best ROI down the road.
    Feb. 7, 2025

    Sponsored